人妻综合网,欧美一级二级三级视频,日韩精品无码波多野结衣,无码国产精品一区二区高潮

產(chǎn)品簡介
鋼邊橡膠止水帶連接方法說明
鋼邊橡膠止水帶連接方法說明
產(chǎn)品價格:¥23
上架日期:2019-11-02 08:33:00
產(chǎn)地:衡水
發(fā)貨地:衡水
供應(yīng)數(shù)量:不限
最少起訂:1米
瀏覽量:407
資料下載:點擊下載
其他下載:暫無相關(guān)下載
詳細(xì)說明
    鋼邊橡膠止水帶十字接頭用在水平施工縫和豎向施工縫的交接點上,直線段用在水平或豎向施工縫,兩者用熱熔接的方式連接成整體,最終形成施工縫橡膠防水。中埋式鋼邊橡膠止水帶連接方法中埋式鋼邊橡膠止水帶熔接前需準(zhǔn)備好熔接接頭、熔接模具、生膠片、橡膠與鋼片連接劑、打磨工具、干凈布等。
    The cross joint of steel edge rubber water stop belt is used at the junction of horizontal construction joint and vertical construction joint, and the straight section is used at horizontal or vertical construction joint. The two joints are joined together by hot fusion, and finally the rubber waterproof of construction joint is bed. Medium-buried steel-edge rubber water-stop connection bbbbbb: before the buried steel-edge rubber water-stop is welded, the weld joint, welding die, raw film, rubber and steel-sheet connector, polishing tool, clean cloth, etc. should be prepared.
    中埋式鋼邊橡膠止水帶熔接方法如下:
    Medium-buried steel-edge rubber water stop is welded as follows:
    (1)將鋼邊橡膠止水帶兩頭,即直線段與十字接頭連接端各大約100mm處的橡膠割掉,用工具,如砂輪將鋼邊打磨光滑。
    (1) Cut off the rubber at the two ends of the rubber water stop tape on the steel edge, i.e. the connecting end of the straight line segment and the cross joint, which is about 100 mm large, and polish the steel edge smoothly with tools such as grinding wheels.

    (2)將鋼邊橡膠止水帶需要熔接的兩端頭搭接處中間留下長30~40mm的空間用于接頭熔接、干凈生膠片的連接。如果生膠片占有灰塵須用干凈布擦干凈灰塵或用打磨機(jī)將生膠片表面打磨干凈后才能使用。

    (2) Leave a space of 30-40 mm in the middle of the overlap between the two ends of the steel-edged rubber water stop belt which need to be welded for the joint welding and the connection of clean raw film. If the raw film occupies dust, it must be cleaned with a clean cloth or polished with a grinder to clean the surface of the raw film before it can be used.
    (3)在已打磨光滑的鋼邊兩面涂刷橡膠與金屬粘結(jié)劑。
    (3) Rubber and bl binders are applied on both sides of polished smooth steel.
    (4)在加工打磨鋼板橡膠止水帶連接端頭的同時預(yù)熱橡膠止水帶的熔接模具好,預(yù)熱時間按電熱絲的發(fā)熱功率約在30分鐘。目的是將模具溫度控制在140~150℃度之間。當(dāng)溫度計顯示模具溫度已到140~150℃即可進(jìn)行后續(xù)步驟。
    (4) The welding die of the preheated rubber water stop is good while grinding the connection end of the steel plate rubber water stop. The preheating time is about 30 minutes according to the heating power of the electric heater wire. The aim is to control the temperature of the die between 140 and 150 degrees C. When the thermometer shows that the temperature of the die has reached 140-150 C, the follow-up steps can be carried out.
    (5)把需要熔接鋼邊橡膠止水帶兩端頭按步驟2搭接放入橡膠熔接模具底模的中間,連接處放滿生膠片。
    (5) Place the two ends of the rubber sealing tape with steel edge to be welded in the middle of the bottom die of the rubber welding die according to step 2, and fill the connection with raw film.
    (6)按模具的對中孔洞,輕輕放置熔接模具的頂模。在安放模具頂模的過程中要避免生膠片和熔接端頭的跑位,如果過程中鋼邊橡膠止水帶需熔接的兩端頭跑位,需重復(fù)此步驟,確保熔接兩端頭的正確位置。
    (6) Place the top die of the welding die gently according to the middle hole of the die. In the process of placing the top die of the die, the running of raw film and fusion end should be avoided. If the two ends of the steel-edged rubber water stop need to be welded in the process, this step should be repeated to ensure the correct bbbbbbbb of the fusion ends.
    (7)用千斤頂將安放好的頂模具加壓。此步驟注意的是:第一次千斤頂加壓壓力不要過大大,加壓至模具頂模和底模之間距離在2cm左右。待熔接鋼邊橡膠止水帶的生膠片硫化一段時間,約5~10分鐘后再進(jìn)行千斤頂?shù)亩渭訅骸?/span>
    (7) Pressure the mounted jacking die with a jack. This step is to note that the pressure of the first jack should not be too large, and the distance between the pressure and the top and bottom dies of the die should be about 2 cm. The raw rubber sheet of the welded steel edge rubber water stop tape is vulcanized for a period of time, and the second pressure of the jack is applied after about 5 to 10 minutes.
    (8)千斤頂二次加壓是將模具縫隙加壓至設(shè)計鋼邊橡膠止水帶斷面。加壓后,保持模具溫度在140~150℃之間,時間約20~30分鐘即可開模。
    (8) The second pressurization of the jack is to press the die gap to the section of the rubber water stop at the design steel edge. After pressing, the mould temperature is kept between 140 and 150 degrees C, and the mould can be opened in about 20 to 30 minutes.

    (9)開模檢查。如檢查發(fā)現(xiàn)生膠片熔合不飽滿,存在缺膠、開裂、分層等現(xiàn)象需返回至步驟1重新開始鋼板橡膠止水帶的端頭熱熔接。如檢查發(fā)現(xiàn)橡膠止水帶接頭處熔合飽滿,不脫膠,可以進(jìn)行下一步驟。


    (9) Opening inspection. If it is found that the raw film is not fully fused, there are glue shortage, cracking, delamination and other phenomena, it is necessary to return to step 1 to restart the hot fusion at the end of the steel sheet rubber water stop. If the inspection finds that the joint of the rubber water stop belt is fully fused and does not degum, the next step can be taken.
    (10)將已熔接好的鋼邊止水帶的鋼邊連接處用釘子或鋼絲連接好,或?qū)⒋私宇^連接處的鋼邊焊接牢固。
    (10) Connect the steel edge joints of the welded steel edge water stop strip with nails or steel wires, or weld the steel edges of the joints firmly.

在線詢盤/留言
  • 免責(zé)聲明:以上所展示的信息由企業(yè)自行提供,內(nèi)容的真實性、準(zhǔn)確性和合法性由發(fā)布企業(yè)負(fù)責(zé),本網(wǎng)對此不承擔(dān)任何保證責(zé)任。我們原則 上建議您選擇本網(wǎng)高級會員或VIP會員。
    0571-87774297  
    avtt一区二区| 国产极品视频在线| 美女久久久久久| 精品亚洲无码一区二区| 亚洲国产成人久久久久久| 91免费在线观看| www.国产传媒| 国产精品美女久久久久久| 日本XXXwWW在线观看| AV无码久久久久久不卡网站| 国产日韩欧美网站| 亚洲多毛视频| 四虎在线免费观看视频| 二区久久| 国产乱视频| 色呦呦vip| 老熟妇欲乱一区二区三区 | 色一情一区二区三区| 久久精品国产精品| 日产精品久久久久久久| AAAAA级少妇高潮大片免费看| 综合无码| 日韩少妇视频| 91日韩精品在线| 国产激情无码| 男女无套内射视频| 久久尹人网| 67pao成人免费视频在线观看| a级免费看| 色老头一区二区三区在线观看| 五月丁香激情四射| 亚洲国产一区二区三区| 成人久久精品视频| 色橹橹欧美在线观看视频高清| 亚洲乱码中文字幕综合| 亚洲美女一级片| 综合色网站| 91精品人妻人人做人碰人人爽| 日韩精品国产一区| 亚洲国产精品VA在线看黑人动漫 | 亚洲一区二区三区香蕉|